Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops

Loading reviews...
$46.09
  • Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops
Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops metallic 3d epoxy floor concrete coating color chart Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Metallic Epoxy Floor Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops

Surecrete 3D Metallic Pearlescent Dry Pigments for Epoxy Floors and Countertops

Loading reviews...
$46.09
Fast Ship: Usually takes 1-2 business days to ship out.
Ships from Florida
(Click for average Ground delivery map )
Ships via FedEx/UPS only

Free shipping for online-orders $49 or more!! (US 48)

  • Product Description:
    • 3D Metallic Pearl mix-in container, 16oz.
    • Each 16oz container of 3D Metallic Pearl color is designed to mix into 3 gallons of DuraKote DK-500 100% Solids Epoxy.
    • 20 Metallic Pearl color options to select from.  Epoxy mixed with different Metallic Pearl colors can be blended on the floor for limitless color combinations and effects.
    • Create awesome floors and countertops using Metallics and Epoxy!
    • How much does it cost to do a floor?  For a 3,000 sq. ft. showroom floor, it comes to about $1.50 per square foot for the epoxy products (DK600 Epoxy First, DK500 PTV with Metallic Colors next, and DK400 on top to protect).  So in terms of flooring costs, very affordable and much cooler!
    • Click here for an image gallery on the Surecrete website of example Metallic Epoxy projects.  The Metallic Epoxy is an artist's medium, so many different looks can be created based on how the metallic epoxy is poured out, spread out, blotted, dripped, drizzled, etc.  If this is your first job using a Metallic Epoxy, plan on getting a little more than you need so you can do some test areas (on a piece of cardboard or old board for example) and come up with your desired look.
    METAL LOOKING EPOXY METALLIC FLOOR EPOXY

    3D Metallic Epoxy coating creates a three-dimensional look and brushed structure that is very unique and becoming a very popular flooring system. 

    Besides the attractive looks, epoxy metallic floors are also known for their durability so they’re suitable for heavy use – like in garage workshops, gyms, show rooms, restaurants, etc.  The process of installation is very quick and what’s maybe the most important to you, the cleaning is extremely easy with one complete smooth floor- no hidden places for the dirt to get into.

    How the 3D Metallic Epoxy 'system' works:

    1. First, prep your concrete surface.  Surface should be profiled/sanded/ground as needed so the surface is rough enough for good bonding of the epoxy.  Use of SCR Etch Prep recommended. Concrete surface MUST be 100% clean, and dry, before proceeding to the next step.
      1. Make sure that temperatures will remain between 50 and 90 degrees Fahrenheit and a relative humidity below 75% and there will be no precipitation in the applied areas for a 12 hour period following application.
    2. Apply DuraKote 600-WB Water-Based Epoxy, usually pigmented black (Water-Based epoxy works great as a vapor barrier and primer, and the black color will help the most 3D Metallic colors to jump out, while a lighter 600-WB base color may be a good choice if trying for a white/light Metallic Epoxy finished surface).  Make sure to wear Spiked Shoes when applying epoxy flooring.
      1. Please note that the color 'PEARL' requires a double dose: 2 of the 16 oz. containers of the 'Pearl' color for each 3 gallons of epoxy.  Or, you can select the DuraKote 600-WB Water-Based Epoxy in 'Silver' color instead of 'Black', and then just use one 16 oz. container of the 'Pearl' metallic add-in.
    3. Once the Water-Based Epoxy has cured through (usually 12 hour minimum), sand with a floor buffer and 100 grit sanding screen, and vacuum up all dust. Sanding Screen and Floor Buffers are sold on Amazon, or can often be rented from most local tool rental stores.
    4. Mix Dura-Kote DK-500 100% Solids Epoxy (most will use the Premium Grade of the Epoxy) the and then mix in the 3D Metallic Pearl Color (Mixer Drills sold here for mixing epoxy). For best results, figure out how much epoxy you will use, and mix the desired amount of the 3D Metallic powder into ONLY the part A of the epoxy the night before, allowing it to saturate and mix better the next day.  Once epoxy is mixed (A&B), simply pour out contents completely in a fairly long trail for application. Use your spreading tools (Squeegee, roller, paint brush, etc.) to create your designs, and once spread out just leave the epoxy and it will continue to self level and blend in.  Pretty easy, don't stress it!
    5. For best durability, apply a topcoat over the Epoxy.  When the Metallic Epoxy coating is cured through (usually 24 hours), sand with 100 grit sanding screen and then apply a topcoat of either DK-400 Polyurethane, or DK-120 Polyaspartic Coating.  Anti-Slip products can also be used in conjunction with the topcoat for areas where water/grease/oil may be present. 16-30 hours after second coat is applied, the surface is ready for light use, and is fully cured after 5-14 days depending on environmental conditions.
    6. A final wear-layer of floor wax can be applied periodically over the floor which will add some slip resistance, and maintain the coatings looking perfect.

    Product Specifications: